Rate this video:
The new Mark Twain Transmission Line runs 96-miles through northeast Missouri, a project built for Ameren Transmission, the utility, by NECA Contractor JF Electric and craftsmen from IBEW Local 2 and Local 702. It’s primary objective will be to relieve power congestion and transport energy from renewable sources, primarily wind, back to the grid